We decided to redo our bathroom and upgrade everything including vanity and sink, cabinets and mirrors, lighting, plumbing fixtures, vinyl floor, and tile surrounding the shower and tub.
Why? We disliked the old flooring, the oak wood style cabinets, and the sage green tiles. As you'll see in the video, this project is pretty well along its way for only having been working on it part-time for the last week.
The only professional that has aided us was a plumber who changed the water supply valves and shower/tub valve. Everything else has been done by the homeowner.
At this point, there's gotta be a week's worth of evenings more to go, and possibly even longer. The last bath remodel took a month of part-time work. So if this one gets done in less than a month, we'll be pleased.